Toronto Metropolitan University's Independent Student Newspaper Since 1967

All Campus News News

Faulty sprinkler causes flood in engineering building

By The News Team

A faulty sprinkler head in the George Vari Engineering and Computing Centre caused flooding on the first, second and third floors, damaging two classrooms and several offices and labs. The flood happened on Jan. 12 and most classes have been temporarily moved to the Victoria building. There is not yet an estimated cost for the damage.

Leave a Reply