Jeff Lagerquist
Online Editor
Get ready to chill at the library like never before.
A large crane arrived at Victoria and Gould to lift three cooling units onto the roof of the library building. The lift was scheduled for today. Strong winds in the downtown core are likely to blame for delaying the installation.
[nggallery id=37]
Leave a Reply