Ryerson President Sheldon Levy revealed the design for the new Church Street Development (CSD), which will be built at 300 Church street, on Wednesday morning. The building will house health sciences programs, nursing suites, labs, a fabrication zone, lecture halls and the new student residence.
An external rendering of new CSD building
The building from the South-East angle
A breakdown of the lower levels of the new building
An internal rendering of the cafe and entry space
Leave a Reply